Scugog bridge reopens with $600,000 in cost savings
The Township of Scugog yesterday announced that the Scugog Line 4 bridge is now open for traffic. It was replaced with a modular bridge which helped save over $600,000 in … Continue reading Scugog bridge reopens with $600,000 in cost savings
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed